Skip to content
News :
PBH Asset receives Maintenance Contract for Pan Borneo Highway Sarawak
Study Visit to Bako National Park
Insights Into Sub Surface Analysis ERT
Maltimur’s participation at UNIMAS’ two recent exhibitions
SSLR2 – Project Begins
Home
About Us
Vision & Mission
Our Strength
Projects
Current
Northern Coastal Highway (NCH)
Sarawak-Sabah Link Road (SSLR) Fasa 2
Road Maintenance
Previous
Pan Borneo Highway Sarawak: (Nyabau to Bakun)
Pan Borneo Highway Sarawak (Phase 1)
Kuching Urban Transportation System (KUTS)
ALiM Academy
About ALiM
Courses
ALiM MConnects
Partnerships
Register
MConnects
Career
Connect!
Category:
work
Home
work
Page 2
work
NCH Site Referencing Exercise
work
Strengthening Our Sustainability Journey
work
Maltimur at 27th World Road Congress 2023 Exhibition in Prague
work
Maltimur Leads Delegation to Kalimantan Barat
work
Maltimur Conducts Recce Ahead of Project
work
Maltimur Inspires UNIMAS Quantity Surveying Students
work
Upskilling With Quantm
work
Maltimur Showcases BIM
work
Maltimur Makes Local Headline
work
KUTS: Moving Society Forward via TOD
Posts navigation
Previous
1
2
3
…
6
Next
×
Questions?
Optimized by Optimole
error:
Content is protected !!