Skip to content
News :
ALiM Academy’s First Training of the year and our first external session in Kuching NORTHERN COASTAL HIGHWAY (NCH) LAUNCHED Connecting For Growth at Lan Berambeh 2025 SSLR2 wins 2025 Going Digital Award Ground Breaking Ceremony of the Sarawak Sabah Link Road Fasa 2 (SSLR2) at Nanga Medamit, Limbang
Maltimur Resources Sdn Bhd
Protege
  • About Us
    • Vision & Mission
    • Our Strength
  • Projects
    • Current
      • Northern Coastal Highway (NCH)
      • Sarawak-Sabah Link Road (SSLR) Fasa 2
      • Road Maintenance
    • Previous
      • Pan Borneo Highway Sarawak: (Nyabau to Bakun)
      • Pan Borneo Highway Sarawak (Phase 1)
      • Kuching Urban Transportation System (KUTS)
  • ALiM Academy
    • About ALiM
    • Courses
    • ALiM MConnects
    • Partnerships
    • Register
  • MConnects
  • Career
  • Sustainability
    • Amanah Sustainability
    • ESG Policy
    • Sustainability Efforts

Blog

  • Home
  • work
  • Pre-VE 9.2
work

Pre-VE 9.2

azahaya
Maltimur Connects_Pre-VE 9.2_A Remote Live Exercise - Progressing The NCH Project

Post navigation

A Glimpse Into The Future KUTS Station Concept Workshop
Maltimur Taking Point In Tender Briefing

Maltimur Resources Sdn Bhd 2020

Construction Field by Acme Themes
Optimized by Optimole
error: Content is protected !!