Skip to content
News :
NORTHERN COASTAL HIGHWAY (NCH) LAUNCHED Connecting For Growth at Lan Berambeh 2025 SSLR2 wins 2025 Going Digital Award Ground Breaking Ceremony of the Sarawak Sabah Link Road Fasa 2 (SSLR2) at Nanga Medamit, Limbang MAUJV Provieds Industry Grant to UNIMAS for Soil Mapping Study in SSLR2 Project
Maltimur Resources Sdn Bhd
Protege
  • About Us
    • Vision & Mission
    • Our Strength
  • Projects
    • Current
      • Northern Coastal Highway (NCH)
      • Sarawak-Sabah Link Road (SSLR) Fasa 2
      • Road Maintenance
    • Previous
      • Pan Borneo Highway Sarawak: (Nyabau to Bakun)
      • Pan Borneo Highway Sarawak (Phase 1)
      • Kuching Urban Transportation System (KUTS)
  • ALiM Academy
    • About ALiM
    • Courses
    • ALiM MConnects
    • Partnerships
    • Register
  • MConnects
  • Career
  • Sustainability
    • Amanah Sustainability
    • ESG Policy
    • Sustainability Efforts

Author: azahaya

IT Executive Maltimur Resources Sdn Bhd
  • Home
  • azahaya
work

NORTHERN COASTAL HIGHWAY (NCH) LAUNCHED

azahaya
work

Connecting For Growth at Lan Berambeh 2025

azahaya
work

SSLR2 wins 2025 Going Digital Award

azahaya
work

Ground Breaking Ceremony of the Sarawak Sabah Link Road Fasa 2 (SSLR2) at Nanga Medamit, Limbang

azahaya
work

MAUJV Provieds Industry Grant to UNIMAS for Soil Mapping Study in SSLR2 Project

azahaya
ALiM

6-Months Training Plan ALiM ACADEMY

azahaya
work

Maltimur’s Amanah Sustainability CSR Programmes

azahaya
work

Maltimur Away Day ’24 ‘Hawaiian Night’

azahaya
work

Maltimur Town Hall #02/2024

azahaya
work

Maltimur at 12th Malaysia Road Conference & Exhibition 2024 and 5th IRF – Asia Pacific Congress

azahaya

Posts navigation

1 2 … 8 Next

Maltimur Resources Sdn Bhd 2020

Construction Field by Acme Themes
Optimized by Optimole
error: Content is protected !!