Skip to content
News :
MAUJV Provieds Industry Grant to UNIMAS for Soil Mapping Study in SSLR2 Project Maltimur's Amanah Sustainability CSR Programmes Maltimur Away Day '24 'Hawaiian Night' Maltimur Town Hall #02/2024 Maltimur at 12th Malaysia Road Conference & Exhibition 2024 and 5th IRF – Asia Pacific Congress
Maltimur Resources Sdn Bhd
Protege
  • About Us
    • Vision & Mission
    • Our Strength
  • Projects
    • Current
      • Northern Coastal Highway (NCH)
      • Sarawak-Sabah Link Road (SSLR) Fasa 2
      • Road Maintenance
    • Previous
      • Pan Borneo Highway Sarawak: (Nyabau to Bakun)
      • Pan Borneo Highway Sarawak (Phase 1)
      • Kuching Urban Transportation System (KUTS)
  • ALiM Academy
    • About ALiM
    • Courses
    • ALiM MConnects
    • Partnerships
    • Register
  • MConnects
  • Career
  • Sustainability
    • Amanah Sustainability
    • ESG Policy
    • Sustainability Efforts

Blog

  • Home
  • work
  • NCH: Pre-Value Assessment Lab
work

NCH: Pre-Value Assessment Lab

azahaya
1-compressed

Post navigation

Building a New Legacy with Maltimur
Infrastructure Development – Catalyst for Economic Resilience

Maltimur Resources Sdn Bhd 2020

Construction Field by Acme Themes
Optimized by Optimole
error: Content is protected !!